[PR] fix(e2e): strengthen upgrade test scenario [camel-k]

2024-05-13 Thread via GitHub
squakez opened a new pull request, #5501: URL: https://github.com/apache/camel-k/pull/5501 An IntegrationPod should not be rolled over during the operator upgrade **Release Note** ```release-note NONE ``` -- This is an automated message from

Re: [PR] fix(e2e): strengthen upgrade test scenario [camel-k]

2024-05-14 Thread via GitHub
squakez closed pull request #5501: fix(e2e): strengthen upgrade test scenario URL: https://github.com/apache/camel-k/pull/5501 -- This is an automated message from the Apache Git Service. To respond to the message, please log on to GitHub and use the URL above to go to the specific comment. T