While EPP packages are being created and tested on Thursday, it would be a
good time to sanity check the staging repo:
http://download.eclipse.org/releases/staging/
(and yes, egit's latest is in there).
Virgo it the only project disabled.
It was failing for some mysterious reasons and then,
I submitted our RC2 contribution for JGit and EGit, will you start another
aggregator build ?
I'll stay on standby until this build is green.
--
Matthias
2012/5/31 David M Williams
>
>- Use the 0.2.x version of the b3 aggregator, running on Eclipse 3.7,
>installed from b3's "3.7 repo",
Use the 0.2.x version of the b3 aggregator, running on Eclipse 3.7,
installed from b3's "3.7 repo", at following URL:
http://download.eclipse.org/modeling/emft/b3/updates-3.7/
See http://wiki.eclipse.org/Juno/Contributing_to_Juno_Build
for more infor
From: Matthias Sohn
To: Cross p
ok, I'll let you know
Can you point me to the p2 repo for installing the current b3 model editor
to update
the contribution files ? Hope this helps to not kill the aggregator build.
--
Matthias
2012/5/30 David M Williams
> sounds like 7 or 8 then? I'm find with that ... let us know if/when do
sounds like 7 or 8 then? I'm find with that ... let us know if/when done.
If it starts to get "past 9" (Eastern) I think we should should say "no
more" ... as with last week, we seem to be having trouble getting a green
build today, on +3 day.
Thanks,
From: Matthias Sohn
To: Cross
Looks like JGit/EGit will contribute late to RC2, after struggling with
builds and tests for weeks I have reached a green build and I hope I can
tag rc2 in another 2-3 hours. Let me know if I am getting too late
then we'll have to skip RC2 and contribute early to RC3. Though
I would prefer to reach
Thanks.
On May 30, 2012, at 10:17 AM, Greg Watson wrote:
> Hi,
>
> PTP will be late for it's +2 build, but there are some changes we need to get
> into RC2 for testing. It will be ready as soon as the build runs (within the
> next hour).
>
> This should have no impact on the Juno aggregation.
Compiled 2012-05-30T12:07
build.eclipse.org
-> Usage exceeding 1GB for: Hudson master jobs and workspace (2012-05-30T10:00)
20.6G emf-emfstore-integration
3.7G skalli
3.0G cbi-pdt-2.2-helios
2.4G papyrus-0.8-EYY-maintenance
2.1G cbi-pdt-3.0-indigo
2.1G emf-cdo-integratio
Hi Jeff,
Excuse me for the issue. I'm now working for the problem, and will fix
soon.
Best regards,
Kentarou
---
Kentarou Fukuda, Ph.D.
IBM Research - Tokyo
Tel: +81-3-5144-2852
E-mail: kenta...@jp.ibm.com
From: Jeff Johnston
To: Cross project issues
Date: 2012/05/31 02:55
Subject:
I updated Linux Tools for RC2, but ran into an issue with ACTF not
finding one of its required features. When I disabled this locally, the
aggregation validated fine. The last build failed with updates from
Linux Tools, ACTF, and Webtools. I updated my local repository so I do
not know if th
The Linux Tools build is missing a few features that should be there and
I am attempting to build and add them in today (waiting for an executor).
We already have an RC2 build offering in place and aggregated
successfully so if the build can't be done in time, we will wait until RC3.
-- Jeff
Folks,
I put in an initial contribution for WTP on the +2 day, however, we
want to update it with a small change. We had an issue with our build
where our JUnits were not running, and thus we did not see one versioning
problem. We fixed our JUnits, fixed the versioning problem, and now
Hello,
GMF-Tooling is one of the 15 projects that haven't submitted IP logs yet.
I stuck with the problem which, to my understanding, is related to the fact
that we a) migrated from CVS to Git, and, b) at the same time completely
changed the set of active committers.
As a result, the automated I
Hi,
PTP will be late for it's +2 build, but there are some changes we need to get
into RC2 for testing. It will be ready as soon as the build runs (within the
next hour).
This should have no impact on the Juno aggregation.
Thanks,
Greg
___
cross-proj