[cross-project-issues-dev] Staging repo for Juno RC2 is complete

2012-05-30 Thread David M Williams
While EPP packages are being created and tested on Thursday, it would be a good time to sanity check the staging repo: http://download.eclipse.org/releases/staging/ (and yes, egit's latest is in there). Virgo it the only project disabled. It was failing for some mysterious reasons and then,

Re: [cross-project-issues-dev] JGit/EGit RC2 contribution will be late

2012-05-30 Thread Matthias Sohn
I submitted our RC2 contribution for JGit and EGit, will you start another aggregator build ? I'll stay on standby until this build is green. -- Matthias 2012/5/31 David M Williams > >- Use the 0.2.x version of the b3 aggregator, running on Eclipse 3.7, >installed from b3's "3.7 repo",

Re: [cross-project-issues-dev] JGit/EGit RC2 contribution will be late

2012-05-30 Thread David M Williams
Use the 0.2.x version of the b3 aggregator, running on Eclipse 3.7, installed from b3's "3.7 repo", at following URL: http://download.eclipse.org/modeling/emft/b3/updates-3.7/ See http://wiki.eclipse.org/Juno/Contributing_to_Juno_Build for more infor From: Matthias Sohn To: Cross p

Re: [cross-project-issues-dev] JGit/EGit RC2 contribution will be late

2012-05-30 Thread Matthias Sohn
ok, I'll let you know Can you point me to the p2 repo for installing the current b3 model editor to update the contribution files ? Hope this helps to not kill the aggregator build. -- Matthias 2012/5/30 David M Williams > sounds like 7 or 8 then? I'm find with that ... let us know if/when do

Re: [cross-project-issues-dev] JGit/EGit RC2 contribution will be late

2012-05-30 Thread David M Williams
sounds like 7 or 8 then? I'm find with that ... let us know if/when done. If it starts to get "past 9" (Eastern) I think we should should say "no more" ... as with last week, we seem to be having trouble getting a green build today, on +3 day. Thanks, From: Matthias Sohn To: Cross

[cross-project-issues-dev] JGit/EGit RC2 contribution will be late

2012-05-30 Thread Matthias Sohn
Looks like JGit/EGit will contribute late to RC2, after struggling with builds and tests for weeks I have reached a green build and I hope I can tag rc2 in another 2-3 hours. Let me know if I am getting too late then we'll have to skip RC2 and contribute early to RC3. Though I would prefer to reach

[cross-project-issues-dev] PTP is done

2012-05-30 Thread Greg Watson
Thanks. On May 30, 2012, at 10:17 AM, Greg Watson wrote: > Hi, > > PTP will be late for it's +2 build, but there are some changes we need to get > into RC2 for testing. It will be ready as soon as the build runs (within the > next hour). > > This should have no impact on the Juno aggregation.

[cross-project-issues-dev] Disk usage report for Hudson/Build

2012-05-30 Thread genie
Compiled 2012-05-30T12:07 build.eclipse.org -> Usage exceeding 1GB for: Hudson master jobs and workspace (2012-05-30T10:00) 20.6G emf-emfstore-integration 3.7G skalli 3.0G cbi-pdt-2.2-helios 2.4G papyrus-0.8-EYY-maintenance 2.1G cbi-pdt-3.0-indigo 2.1G emf-cdo-integratio

Re: [cross-project-issues-dev] Hudson Juno aggregation build failure and ACTF

2012-05-30 Thread Kentarou Fukuda
Hi Jeff, Excuse me for the issue. I'm now working for the problem, and will fix soon. Best regards, Kentarou --- Kentarou Fukuda, Ph.D. IBM Research - Tokyo Tel: +81-3-5144-2852 E-mail: kenta...@jp.ibm.com From: Jeff Johnston To: Cross project issues Date: 2012/05/31 02:55 Subject:

[cross-project-issues-dev] Hudson Juno aggregation build failure and ACTF

2012-05-30 Thread Jeff Johnston
I updated Linux Tools for RC2, but ran into an issue with ACTF not finding one of its required features. When I disabled this locally, the aggregation validated fine. The last build failed with updates from Linux Tools, ACTF, and Webtools. I updated my local repository so I do not know if th

[cross-project-issues-dev] Linux Tools is trying to get an update in today

2012-05-30 Thread Jeff Johnston
The Linux Tools build is missing a few features that should be there and I am attempting to build and add them in today (waiting for an executor). We already have an RC2 build offering in place and aggregated successfully so if the build can't be done in time, we will wait until RC3. -- Jeff

[cross-project-issues-dev] WTP is updating its +2 contribution

2012-05-30 Thread Carl Anderson
Folks, I put in an initial contribution for WTP on the +2 day, however, we want to update it with a small change. We had an issue with our build where our JUnits were not running, and thus we did not see one versioning problem. We fixed our JUnits, fixed the versioning problem, and now

Re: [cross-project-issues-dev] Juno IP Logs

2012-05-30 Thread Michael Golubev
Hello, GMF-Tooling is one of the 15 projects that haven't submitted IP logs yet. I stuck with the problem which, to my understanding, is related to the fact that we a) migrated from CVS to Git, and, b) at the same time completely changed the set of active committers. As a result, the automated I

[cross-project-issues-dev] PTP is late for +2

2012-05-30 Thread Greg Watson
Hi, PTP will be late for it's +2 build, but there are some changes we need to get into RC2 for testing. It will be ready as soon as the build runs (within the next hour). This should have no impact on the Juno aggregation. Thanks, Greg ___ cross-proj