Re: [cross-project-issues-dev] LDT repo doesn't exist for Neon_maintenance

2016-08-24 Thread Simon Bernard
Hi, Sry about that, you fixed it in a right way. Thx Jeff. Simon Le 24/08/2016 à 00:07, Jeff Johnston a écrit : The ldt repo specified in ldt.b3aggricon for the Neon_maintenance release specifies http://download.eclipse.org/ldt/releases/milestones/1.4M3 which doesn't currently exist. It app

[cross-project-issues-dev] Downtime for HIPP1, August 26 @ 3pm

2016-08-24 Thread Webmaster (Derek Toolan)
Hello all, Just a quick note to inform projects that are currently running on HIPP1 (NOTE: I have included a list of you guys below), that the HIPP1 host is showing signs of RAM degradation, and requires some new DIMMs. The replacement of RAM will require a shutdown of the host, and therefore

[cross-project-issues-dev] Sapphire to participate in Oxygen

2016-08-24 Thread Konstantin Komissarchik
Sapphire project will participate in Oxygen with +3 offset. The initial version contributed will be the 9.1 release that is slated for release in September. https://projects.eclipse.org/projects/technology.sapphire/releases/9.1 Thanks, - Konstantin ___

[cross-project-issues-dev] Status of Neon.1 RC1 plus reminder about RC2

2016-08-24 Thread David Williams
I do not know how RC1 "runs", but it was building ok until today. There is a problem from ECF contribution that is the same as Bug 492904 which I have re-opened. If I do not hear from the ECF team soon, I will revert their contribution in order to ge

[cross-project-issues-dev] Disk usage report for Hudson/Build

2016-08-24 Thread genie
Compiled 2016-08-24T16:07 build.eclipse.org -> Usage exceeding 1GB for: Hudson master jobs and workspace (2016-08-24T10:00) 2.8G papyrus-trunk-nightly 1.7G papyrus-trunk-extra-nightly -> Usage exceeding 1GB for: /shared (1000G capacity) (2016-08-24T10:00) 1301.5G hipp 235.4G eclip

[cross-project-issues-dev] Neon staging repository for RC1 is complete

2016-08-24 Thread David Williams
It is Wednesday, after 5, and no one has requested a delay, so I will consider RC1 staging repository complete. I have disabled the aggregation jobs for Neon (but not the VALIDATE.gerrit one) to be sure nothing accidentally and automatically gets