Re: [cross-project-issues-dev] Staging for SimRel 2019-12 Milestone 1 (M1) is complete

2020-10-15 Thread Frederic Gurr
Hi Jonah, You are absolutely right. This should have read 2020-12. 2019-12 was wishful thinking on my part. 😩 Regards, Fred On Thu, 15 Oct 2020, 19:32 Jonah Graham, wrote: > HI Fred, > > I assume the title and links were all supposed to read 2020-12? I have > published EPP based on this assum

Re: [cross-project-issues-dev] Staging for SimRel 2019-12 Milestone 1 (M1) is complete

2020-10-15 Thread Jonah Graham
HI Fred, I assume the title and links were all supposed to read 2020-12? I have published EPP based on this assumption. Thanks, Jonah On Thu., Oct. 15, 2020, 06:25 Frederic Gurr, < frederic.g...@eclipse-foundation.org> wrote: > Hi, > > The staging repository for 2019-12 M1 is complete and read

[cross-project-issues-dev] Staging for SimRel 2019-12 Milestone 1 (M1) is complete

2020-10-15 Thread Frederic Gurr
Hi, The staging repository for 2019-12 M1 is complete and ready for EPP. To confirm that everything works as expected, please test => http://download.eclipse.org/staging/2019-12/ This will become the official "M1 Simultaneous Milestone" on Friday. => http://download.eclipse.org/releases/2019-1

[cross-project-issues-dev] Staging for SimRel 2019-12 Milestone 1 (M1) is complete

2019-10-17 Thread Frederic Gurr
Hi, Since nobody asked for an extension, I'm declaring the staging repository for 2019-12 M1 as complete and ready for EPP. To confirm that everything works as expected, please test => http://download.eclipse.org/staging/2019-12/ This will become the official "M1 Simultaneous Milestone" on Frid