Bug#75673: wnpp: zen: packaging status report

2005-09-13 Thread Mohammed Adnene Trojette
On Fri, Jan 14, 2005, Guillem Jover wrote: > be uploading it to experimental instead in a week or two. Once sarge > is release I'll move the packages to unstable. Hello, what is the status of this, now that Sarge is released? -- adn Mohammed Adnène Trojette

Bug#75673: wnpp: zen: packaging status report

2005-01-14 Thread Frederik Dannemare
On Friday 14 January 2005 00:30, Guillem Jover wrote: > Hi, > > I've had packages for zen for a long time. Although I wanted to fix > some missing details (like the curses interface), and then sarge was > about to be released so I waited to not get it included in it. I'll > be uploading it to exper

Bug#75673: wnpp: zen: packaging status report

2005-01-13 Thread Guillem Jover
Hi, I've had packages for zen for a long time. Although I wanted to fix some missing details (like the curses interface), and then sarge was about to be released so I waited to not get it included in it. I'll be uploading it to experimental instead in a week or two. Once sarge is release I'll move