Hi
Not sure about the exact problem with the disabled tests below on windows as
they all ran green for me on my old windows 7 box after reenabling:
- ThrottlerTest
- AwaitingConsumerTest
- ConsumerCompletionTest
- ImmediateConsumerTest
Babak
Claus Ibsen-2 wrote
> Hi
>
> I got the windows issu
Please don’t commit any code into Apache Camel master branch for the next 12
hours, I’m doing the release cut now.
--
Willem Jiang
Red Hat, Inc.
Web: http://www.redhat.com
Blog: http://willemjiang.blogspot.com (English)
http://jnn.iteye.com (Chinese)
Twitter: willemjiang
Weibo: 姜宁willem
O
I just fixed an Avro issue: https://issues.apache.org/jira/browse/CAMEL-8453.
It wasn't working at all from spring or blueprint so would be nice to make
it into 2.15 :-)
On Fri, Mar 6, 2015 at 8:20 AM, Willem Jiang wrote:
> Yeah, it looks like Camel 2.15 is ready to go.
> As we just commit some
Yeah, it looks like Camel 2.15 is ready to go.
As we just commit some changes into master, I’m planing to hold the cut util
the latest CI build result is out.
Please hold your commit today unless the commit is to fix the critical error
that you find, I will do the cut about 12 hours later.
Reg
Hi,
I sneaked that one [1] into the 2.15.0. This is critical concurrency
bug in Camel Netty component. We definitely should have it included in
the 2.15.
Cheers.
[1] https://issues.apache.org/jira/browse/CAMEL-8450
On Fri, Mar 6, 2015 at 10:37 AM, Claus Ibsen wrote:
> Hi
>
> I got the windows
Hi
I got the windows issues fixed. There is 2 outstanding, hdfs2 and
univelocity parsers. The latter does not fail on windows for the
author of the component.
For hdfs2 it seems a hadoop issue on windows in general.
Anyhow the state of the code is as best ever. I think we are very
close to be re
Hi
I am doing a full test on windows and fix the tests one by one. But
should have all ready before Willem cuts the RC.
On Wed, Mar 4, 2015 at 12:50 PM, Willem Jiang wrote:
> I just ran the OSGi integration tests on Apache Camel 2.15-SNAPSHOT, all test
> passed.
> I’m planing to do the cut this
Just some upgrades on my side, and a couple of fixes, but definitely,
not release blocker.
Regards
JB
On 03/04/2015 12:50 PM, Willem Jiang wrote:
I just ran the OSGi integration tests on Apache Camel 2.15-SNAPSHOT, all test
passed.
I’m planing to do the cut this Friday. Please let me know if
The camel-hdfs/hdfs2 issue is not present in my camel tests. There's some
problem in Fuse env which I have to investigate. So nothing important from
my side.
regards
Grzegorz Grzybek
2015-03-04 15:36 GMT+01:00 Henryk Konsek :
> I will hold some Spring Boot and MQTT stuff I planned to commit unti
I will hold some Spring Boot and MQTT stuff I planned to commit until
the 2.15.0 is out. Nothing really urgent.
Can't wait to test RC1 :) .
Laters!
On Wed, Mar 4, 2015 at 12:53 PM, Grzegorz Grzybek wrote:
> Hi Willem
>
> I've fixed 2 issues related to camel-hdfs(2), there's 3rd issue I want to
Hi Willem
I've fixed 2 issues related to camel-hdfs(2), there's 3rd issue I want to
check. Probably not a problem, but I need ~2 hours.
regards
Grzegorz Grzybek
2015-03-04 12:50 GMT+01:00 Willem Jiang :
> I just ran the OSGi integration tests on Apache Camel 2.15-SNAPSHOT, all
> test passed.
>
I just ran the OSGi integration tests on Apache Camel 2.15-SNAPSHOT, all test
passed.
I’m planing to do the cut this Friday. Please let me know if there is any last
minute patch need to be part of Camel 2.15.0.
--
Willem Jiang
Red Hat, Inc.
Web: http://www.redhat.com
Blog: http://willemjiang
Hi Claus,
It’s easy to change the maven version inside the Jenkins Job configuration UI.
I already upgraded the maven version across the Apache trunk jobs.
--
Willem Jiang
Red Hat, Inc.
Web: http://www.redhat.com
Blog: http://willemjiang.blogspot.com (English)
http://jnn.iteye.com (Chinese)
Tw
Hi
Willem is going to cut the 2.15.0 RC this week.
We have all the bits for this release now. I am currently testing
camel-ftp on windows as a user reported he had a test failure there.
On Wed, Feb 11, 2015 at 6:42 PM, Claus Ibsen wrote:
> Hi
>
> The next big Camel release is 2.15.0, and we sh
Hi
This is just a heads up for any last minute stuff you think needs to
be addressed before we cut the Camel 2.15.0 RC.
If all goes well then we can start cutting the RC this week.
On Wed, Feb 11, 2015 at 6:42 PM, Claus Ibsen wrote:
> Hi
>
> The next big Camel release is 2.15.0, and we should
t; Von: Claus Ibsen [mailto:claus.ib...@gmail.com]
> Gesendet: Samstag, 21. Februar 2015 08:25
> An: dev
> Betreff: Re: Closing down on Apache Camel 2.15.0 release
>
> Hi
>
> There is some CI build issues using old version of Maven. I have asked
> INFRA to upgrade.
> http
Hi
There is some CI build issues using old version of Maven. I have asked
INFRA to upgrade.
https://issues.apache.org/jira/browse/INFRA-9187
On Fri, Feb 20, 2015 at 1:04 PM, Claus Ibsen wrote:
> Hi
>
> So we are getting closer now. We have documentation in the XML schemas
> now. There is a few t
Hi
So we are getting closer now. We have documentation in the XML schemas
now. There is a few tickets logged to further improve this, but that
can eventually be done for next release if we dont make that in time.
We will continue work and close down on the release, so we would be in
shape for ear
Hi
The next big Camel release is 2.15.0, and we should start to close
down so we would be ready to release it .. such as in next month.
I suggest we take the rest of february to work on what the community
and we would like to include in this release. And then close down on
the release to fix test
19 matches
Mail list logo