On 3/28/13 3:46 AM, luc wrote:
> Hi all,
>
> Here we are. The final issues in JIRA scheduled for 3.2 have been
> either
> solved (a lot of them) or postponed (a few of them).
>
> If everybody agree, I volunteer to be the release manager for this
> version.
> I will most probably temporarily flag th
On Thu, Mar 28, 2013 at 11:46 AM, luc wrote:
> Hi all,
>
> Here we are. The final issues in JIRA scheduled for 3.2 have been either
> solved (a lot of them) or postponed (a few of them).
>
> If everybody agree, I volunteer to be the release manager for this version.
> I will most probably tempora
Hi all,
Here we are. The final issues in JIRA scheduled for 3.2 have been
either
solved (a lot of them) or postponed (a few of them).
If everybody agree, I volunteer to be the release manager for this
version.
I will most probably temporarily flag the two extremely long Bobyqa
tests as
@igno