Re: [math] preparing 3.2 release

2013-03-28 Thread Phil Steitz
On 3/28/13 3:46 AM, luc wrote: > Hi all, > > Here we are. The final issues in JIRA scheduled for 3.2 have been > either > solved (a lot of them) or postponed (a few of them). > > If everybody agree, I volunteer to be the release manager for this > version. > I will most probably temporarily flag th

Re: [math] preparing 3.2 release

2013-03-28 Thread Thomas Neidhart
On Thu, Mar 28, 2013 at 11:46 AM, luc wrote: > Hi all, > > Here we are. The final issues in JIRA scheduled for 3.2 have been either > solved (a lot of them) or postponed (a few of them). > > If everybody agree, I volunteer to be the release manager for this version. > I will most probably tempora

[math] preparing 3.2 release

2013-03-28 Thread luc
Hi all, Here we are. The final issues in JIRA scheduled for 3.2 have been either solved (a lot of them) or postponed (a few of them). If everybody agree, I volunteer to be the release manager for this version. I will most probably temporarily flag the two extremely long Bobyqa tests as @igno