Yun Gao created FLINK-22087:
-------------------------------

             Summary: CheckpointPlanCalculator should abort checkpoint if tasks 
is in canceling/canceled and so on
                 Key: FLINK-22087
                 URL: https://issues.apache.org/jira/browse/FLINK-22087
             Project: Flink
          Issue Type: Task
          Components: Runtime / Checkpointing
            Reporter: Yun Gao
             Fix For: 1.13.0


When refactoring the checkpoint triggering logic in  
[FLINK-21067|https://issues.apache.org/jira/browse/FLINK-21067], it tries to 
also support the FINISHED state, but it change the abort condition from == 
RUNNING to != (CREATED, SCHEDULED, DEPLOYING), which makes the checkpoint could 
not be aborted in these cases. This might happen if during trigger there is 
also job failover. It might cause trigger failure and make checkpoint has to 
wait for timeout.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to