Vihang Karajgaonkar created HIVE-19505:
------------------------------------------

             Summary: Increase number of parallel runs from 2 per node to 4
                 Key: HIVE-19505
                 URL: https://issues.apache.org/jira/browse/HIVE-19505
             Project: Hive
          Issue Type: Sub-task
            Reporter: Vihang Karajgaonkar
            Assignee: Vihang Karajgaonkar


The test cluster is under utilized. For the short run we can increase the 
parallel threads from 2 to 3 (or may be 4) which will speedup parallel test 
batches.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to