Yaguang Jia created KYLIN-5437:
----------------------------------

             Summary: After the build job is terminated, the total time spent 
on the job is still calculated
                 Key: KYLIN-5437
                 URL: https://issues.apache.org/jira/browse/KYLIN-5437
             Project: Kylin
          Issue Type: Bug
          Components: Job Engine
    Affects Versions: 5.0-alpha
            Reporter: Yaguang Jia
            Assignee: Yaguang Jia
             Fix For: 5.0-alpha


The total elapsed time is still being calculated when the build task 
terminates, causing confusion on the user side.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to