Re: [l10n-dev] Deadline for OOo 3.0 final translations

2009-01-27 Thread Frco. Javier Rial
I'll assume that version targeted for OpenOffice.org 3.1 is m39 as it was planned.. Frco. Javier Rial escribió: I know that m40 contains changed string (about one hundred strings changed in UI), but what I want to ask is: is DEV300_m40 the version target for 3.1 or still remains m39 for

[l10n-dev] New Strings after 3.2 UI-freeze (Re: [l10n-dev] Deadline for OOo 3.0 final translations)

2009-01-27 Thread Andre Schnabel
Hi, Original-Nachricht Von: Frco. Javier Rial fjr...@cesga.es I'll assume that version targeted for OpenOffice.org 3.1 is m39 as it was planned.. no ... as the is no special branch yet for 3.1, the code will be branched later and 3.1 will contain all changes from m40.

Re: [l10n-dev] Deadline for OOo 3.0 final translations

2009-01-27 Thread Ain Vagula
m40 contains tasks for 3.1 and as there is no branch for 3.1 still, I'd assume that m40 is targeted for 3.1. http://eis.services.openoffice.org/EIS2/cws.rss.CWSAnnounceNewsFeed/mws?guid=7116 ain On Tue, Jan 27, 2009 at 10:20, Frco. Javier Rial fjr...@cesga.es wrote: I'll assume that version

Re: [l10n-dev] Deadline for OOo 3.0 final translations

2009-01-27 Thread Rafaella Braconi
Hi, On 01/27/09 12:17, Ain Vagula wrote: m40 contains tasks for 3.1 and as there is no branch for 3.1 still, I'd assume that m40 is targeted for 3.1. http://eis.services.openoffice.org/EIS2/cws.rss.CWSAnnounceNewsFeed/mws?guid=7116 yes, I am afraid that m40 will be the target. I'll work on

Re: [l10n-dev] Deadline for OOo 3.0 final translations

2009-01-26 Thread Frco. Javier Rial
I' ve already done the job for DEV300_m39 but, on January 23, DEV300_m40 appeared. Is this the version to translate for OOo3.1?? Thanks Vladimir Glazounov escribió: Hi all, February 2nd we have the deadline for OOo 3.1 final translations (s.

Re: [l10n-dev] Deadline for OOo 3.0 final translations

2009-01-26 Thread Andras Timar
2009.01.26. 9:42 keltezéssel, Frco. Javier Rial írta: I' ve already done the job for DEV300_m39 but, on January 23, DEV300_m40 appeared. Is this the version to translate for OOo3.1?? Thanks DEV300_m40 contains new and changed strings compared to DEV300_m39. See

Re: [l10n-dev] Deadline for OOo 3.0 final translations

2009-01-26 Thread Frco. Javier Rial
I know that m40 contains changed string (about one hundred strings changed in UI), but what I want to ask is: is DEV300_m40 the version target for 3.1 or still remains m39 for OOO3.1 (as Rafaella Braconi said)?? Quoting Rafaella:

[l10n-dev] Deadline for OOo 3.0 final translations

2009-01-19 Thread Vladimir Glazounov
Hi all, February 2nd we have the deadline for OOo 3.1 final translations (s. http://wiki.services.openoffice.org/wiki/OOoRelease31). Keep in mind that the time slot till last cws integration is very short, so We have to reject all files delivered too late. As the integration cause a lot of

[l10n-dev] Deadline for OOo 3.0 final translations

2008-06-30 Thread Vladimir Glazounov
Hi all, July 04 we have the deadline for OOo 3.0 final translations (s. http://wiki.services.openoffice.org/wiki/OOoRelease30). Keep in mind that the time slot till last cws integration is very short, so We have to reject all files delivered too late. As the integration cause a lot of work