Hi, Currently there are 197 issues with status RESOLVED and resolution LATER (half of them in the "www" component with target "CEE Consider-future" though), plus 58 issues with status RESOLVED and resolution REMIND. I consider those combinations mere nonsense, even if the usage is explained in http://qa.openoffice.org/scdocs/issue_lifecycle.html#status
A status is a status, not some wishful thinking for the future. If we needed a separate status for that it would be something like POSTPONED. When searching for "open" (to be worked on) issues people and tools query for issues that are not resolved and not closed. Having a resolution means the issue is no issue (anymore). If the issue is considered to be resolved later, set a target that says so and don't pretend the issue was resolved. Thanks Eike -- OOo/SO Calc core developer. Number formatter stricken i18n transpositionizer. SunSign 0x87F8D412 : 2F58 5236 DB02 F335 8304 7D6C 65C9 F9B5 87F8 D412 OpenOffice.org Engineering at Sun: http://blogs.sun.com/GullFOSS Please don't send personal mail to this [EMAIL PROTECTED] account, which I use for mailing lists only and don't read from outside Sun. Use [EMAIL PROTECTED] Thanks.
pgpfjg98x3hjq.pgp
Description: PGP signature