Sounds good James.
On Thu, Oct 19, 2017 at 2:32 PM, James Taylor
wrote:
> Looks like PHOENIX-4237 is ready, so this new built-in requires a minor
> release. I'll volunteer to RM for a 4.13 release for 0.98 and 1.3 and we
> can maintain patch releases for the 4.13-HBase-0.98 release going forward
Looks like PHOENIX-4237 is ready, so this new built-in requires a minor
release. I'll volunteer to RM for a 4.13 release for 0.98 and 1.3 and we
can maintain patch releases for the 4.13-HBase-0.98 release going forward.
I'd like to target an RC at the end of next week (10/27).
Sound ok?
Thanks,
FYI, fixes for these issues will be ported to the 4.12-HBase-0.98 and
4.x-HBase-0.98 branch by the assignee, so no need for you to do that.
On Mon, Oct 16, 2017 at 4:02 PM, Andrew Purtell wrote:
> Thanks James.
> Will start this week, then.
>
>
> On Mon, Oct 16, 2017 at 3:36 PM, James Taylor
>
Thanks James.
Will start this week, then.
On Mon, Oct 16, 2017 at 3:36 PM, James Taylor
wrote:
> We've found some pretty serious bugs [1] that would be good to get fixes
> out for in a patch release. I was thinking perhaps a simultaneous 4.12.1
> release for 0.98 and 1.3 in two or three weeks?
We've found some pretty serious bugs [1] that would be good to get fixes
out for in a patch release. I was thinking perhaps a simultaneous 4.12.1
release for 0.98 and 1.3 in two or three weeks? Might be one or two other
issues that make it in opportunistically.
Thanks for asking!
[1]
https://issu
When are we planning to have the 4.13 release? Any timeline yet. Probably
premature to ask, but why not. One month from now? Two?
This will help me plan out time to attend to backports/maintenence of the
0.98 branch ahead of the next RC.
Thanks in advance!
On Wed, Oct 11, 2017 at 11:09 AM, And
I volunteer.
I may need help on the backports in the beginning. Consider me a new guy.
On Wed, Oct 11, 2017 at 10:10 AM, James Taylor
wrote:
> There's a need to continue doing HBase 0.98 releases. I'm looking for a
> volunteer to be the RM. This would entail keeping an eye on JIRAs that make
>
There's a need to continue doing HBase 0.98 releases. I'm looking for a
volunteer to be the RM. This would entail keeping an eye on JIRAs that make
sense to back port to either the 4.12-HBase-0.98 for a point release or the
4.x-HBase-0.98 branch for a minor release. Developers/committers may back
p