[ 
https://issues.apache.org/jira/browse/SLING-11091?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Joerg Hoh reassigned SLING-11091:
---------------------------------

    Assignee: Joerg Hoh

> Expose the number of scheduled jobs
> -----------------------------------
>
>                 Key: SLING-11091
>                 URL: https://issues.apache.org/jira/browse/SLING-11091
>             Project: Sling
>          Issue Type: Improvement
>          Components: Event
>    Affects Versions: Event 4.2.24
>            Reporter: Joerg Hoh
>            Assignee: Joerg Hoh
>            Priority: Major
>
> Eventing should expose the total number of scheduled jobs as a metric; I have 
> seen cases where to incorrectly unscheduling the total number of scheduled 
> jobs was getting huge (> 10k), thus overloading the system.



--
This message was sent by Atlassian Jira
(v8.20.1#820001)

Reply via email to