[ 
https://issues.apache.org/jira/browse/UIMA-3365?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Work on UIMA-3365 stopped by Lou DeGenaro.

> DUCC job driver (JD) ERROR client.WorkItemListener onBeforeProcessCASHandler  
>    N/A seqNo:null casId:1602519189 java.lang.NullPointerException
> -----------------------------------------------------------------------------------------------------------------------------------------------
>
>                 Key: UIMA-3365
>                 URL: https://issues.apache.org/jira/browse/UIMA-3365
>             Project: UIMA
>          Issue Type: Bug
>          Components: DUCC
>            Reporter: Lou DeGenaro
>            Assignee: Lou DeGenaro
>             Fix For: 1.0-Ducc
>
>
> Job 93735.
> It seems that the first callback expected by JD for work item 659 comes.  
> However the second callback does not arrive within 60 seconds, so the work 
> items is reaped.  Then, 2 seconds later the missing callback finally (and 
> unexpectedly) arrives causing the NPE in JD.
> The Job seems to actually run to completion, but is flagged with lost work 
> items.  This makes sense, since if the JP does get the work item it will 
> process it.  However, the JD will begin queuing "extra" work items since it 
> does not understand that such work items are not really lost.  This may 
> increasingly aggravate the problem by having the JD put out to queue more 
> work items than the present JP capacity can handle.



--
This message was sent by Atlassian JIRA
(v6.1#6144)

Reply via email to