Hi,
Sorry for late reply. I was running out of time, so I used the offset tune
future of UHD to handle that spike. See the following link, hope it helps,
http://files.ettus.com/manual/structuhd_1_1tune__request__t.html
--
Bob
On Sat, Apr 2, 2016 at 7:41 AM, hanwen
Hi Bob,
I came up with the same issue and I hope the DC leakage from Tx should
disappear right after the Tx burst is finished, but acturally I still saw
the strong DC during the pure Rx time lot.
Have you got a solution for that? Thanks.
Br, Hanwen
2014-10-31 7:31 GMT+01:00 bob wole
On 10/29/2014 01:54 PM, bob wole via USRP-users wrote:
USRPN210r4 with SBX
I am observing a strong spike at the center of the receive spectrum
when I start burst transmission.
My top flowgraph contains following two hierarchical blocks
1) A transmitter flow graph with (tx_time,