I want to go thru the alignment procedure for the 4-NB as called out in its 
data sheet (page 1). After I have peaked the two variable caps (C3 and C6), the 
next step is too connect pin 2 of the calibrator socket to ground. Is this 
referring to pin 2 of the xtal calibrator socket?

Regards,

Roger W5RDW
Murphy, Texas  
_______________________________________________
Drakelist mailing list
Drakelist@zerobeat.net
http://mailman.zerobeat.net/mailman/listinfo/drakelist

Reply via email to