Daniel:
We typically take 10-100 points per location (Pathfinder will average
them all together), and also make sure you run the differential correction
algorithm. Granted, 1997 is a bit old so I'm not entirely sure the
capabilities of the software back then -- you might want to consider
upgr
I've just started using the 1997 Trimble Pathfinder Office software, and I'm
looking for ways to minimize error. I've been collecting points with the
Trimble Asset Surveyor v4.01.
I've taken two sets of points for the same location, and the some of the
corrected points for the same location are s
Hello, ecologists.
This message contains a summary of the contents of vol. 38 no. 1 of the
quarterly journal Western Birds, which will be mailed out shortly. All
members of Western Field Ornithologists (WFO) receive Western Birds. More
information is available online: wfo-cbrc.org/journal.html.
B