PM
To: elecraft@mailman.qth.net; Brian Mury
Subject: Re: [Elecraft] Elecraft K2 #4355 is just about finished.
Hi
It really does not matter with one exception The KPA100 and 60M option
require removal of the heat sink on the K2. This is not something you want
to do many times because of the
Brian,
My recommendation is to build the SSB option first.
After the SSB option is installed, you can do all the filter alignments and
be finished with it so you can enjoy the receiver while building the KPA100.
The options that impact the base K2 alignment are the KSB2, K160RX and the
K60XV - so
nk to
install the hardware.
Don Brown
KD5NDB
- Original Message -
From: Brian Mury<mailto:[EMAIL PROTECTED]>
To: elecraft@mailman.qth.net<mailto:elecraft@mailman.qth.net>
Sent: Tuesday, July 06, 2004 12:59 AM
Subject: Re: [Elecraft] Elecraft K2 #4355 is just about
On Mon, 2004-07-05 at 22:44, Hisashi T Fujinaka wrote:
> Now, what order do I put together the SSB, 60M kit, and KPA100?
I'm still trying to decide in which order to build the SSB and the
KPA100. I figure I should do the KPA100 first, because 15W isn't much on
SSB, but then I also figure I could b
Well, I didn't do much else over the long weekend. Ran the wood chipper
this afternoon and so I'm too tired to mount the speaker. I'll have to
find my wirestrippers and who needs to do that at 10PM?
Other than that, it went together pretty easily.
Now, what order do I put together the SSB, 60M k
5 matches
Mail list logo