I would like to have one power cord with a Y connection to the KPA100 -
and have the KAT100 get it's power internally in the EC2 from the KPA/100. I
would like to be able to have all three modules (the K2, the KPA100, and
KAT100) turn on via the front on/off switch on the K2.
Note that the
G'day,
All I do is common the individual power leads to the K2 and external
KPA/KAT at the power supply. Seems the simplest thing to do and ensures
the correct power up sequence. No diodes required, no voltage drop on the
KPA lead passed through to K2. Things can be made too complicated,
2 matches
Mail list logo