RE: Hipot test at production - requirements for tester

2002-06-21 Thread Peter Tarver
All - From UL's NWGQ Standardized Appendix Pages (these are for ITE products) 2.1.2.2If the output of the test-equipment transformer is less than 500 volt-amperes, the equipment shall include a voltmeter in the output circuit to indicate the test potential directly. It's impossible to

RE: Hipot test at production - requirements for tester

2002-06-19 Thread Gregg Kervill
500 VA (and greater) is used for TYPE TESTING only. Any kind of breakdown that pulls more than 5 mA is potentially lethal and non-compliant. There is good reason for limiting the EOL hot-pot current (dynamically - or even with a trip) as low as possible. Best regards Gregg Gregg