RE: reinforced insulation - EN60950

2003-05-12 Thread Peter L. Tarver
Alexandru - You have received several good answers. I would add the following. To Rich Nute's descriptor of active devices, add, nonlinear devices, to those types of components not acceptable for use in place of insulation. This would expand the scope to include gas tube and other voltage

Re: reinforced insulation - EN60950

2003-05-09 Thread douglas_beckw...@mitel.com
by: cc: owner-emc-pstc@majordom Subject: reinforced insulation - EN60950 o.ieee.org

Re: reinforced insulation - EN60950

2003-05-08 Thread Rich Nute
Hi Alexandru: 1. Is the combination of Basic Insulation + FuseTransorb(15V) equivalent to Reinforced Insulation? No. The scheme of protection against electric shock relies on passive devices, not active devices. As a general rule, active devices, e.g., transorb, are not allowed as

Listserver delays -- Re: reinforced insulation - EN60950

2003-05-08 Thread Rich Nute
Strange behavior of the list-server. Although I got some out-of-office replies, neither I or my fellows in the office (members of the list) have received the message posted 24 h ago. I'll try again... We are still experiencing delivery problems from the listserver. The IEEE gurus

RE: reinforced insulation - EN60950

2003-05-08 Thread richwo...@tycoint.com
...@majordomo.ieee.org' Subject: reinforced insulation - EN60950 Dear colleagues, As part of a PCB design required to be compliant with EN60950, we want to use the configuration described below, to be able to relax the traces separation. The circuit intended to become SELV is accessible

reinforced insulation - EN60950

2003-05-08 Thread Alexandru Guidea
Dear colleagues, As part of a PCB design required to be compliant with EN60950, we want to use the configuration described below, to be able to relax the traces separation. The circuit intended to become SELV is accessible to the operator. Questions: 1. Is the combination of Basic Insulation +

reinforced insulation - EN60950

2003-05-07 Thread Alexandru Guidea
Strange behavior of the list-server. Although I got some out-of-office replies, neither I or my fellows in the office (members of the list) have received the message posted 24 h ago. I'll try again... Dear colleagues, As part of a PCB design required to be compliant with EN60950, we want to