Do you have steppers with software step generation? If so, calculate
base_period according to your measured max latency, your step driver
timings and required step rate in Hz. The same goes for software PWM
generation or encoder counting, if you're doing those things.
Otherwise, do not use a base
thanks for the answer Jeff,,
now, how do we calculate base_period and servo period?
Jeff Epler writes:
>
> The latency-test runs the following realtime component:
> http://git.linuxcnc.org/gitweb?p=emc2.git;a=blob;f=src/hal/components/timedelta.comp
>
> Each time a realtime thread runs, the ti
sorry,,I mean the base and servo thread..
how do we calculate them?
--
ThinkGeek and WIRED's GeekDad team up for the Ultimate
GeekDad Father's Day Giveaway. ONE MASSIVE PRIZE to the
lucky parental unit. See the prize lis