Re: [E-devel] 1.12 release schedule proposal

2014-08-19 Thread stefan
Hello. On 2014-08-17 13:28, Tom Hacohen wrote: > I think this one was a good release. Let's continue doing it this way. I removed the draft status now from the 1.12 schedule. The one or two days we will be late for 1.11 will get cut of the first merge window. As this is four weeks its not a big

Re: [E-devel] 1.12 release schedule proposal

2014-08-17 Thread Daniel Juyung Seo
Yes the release cycle is heading to a stabilized status. Special thanks to stefan and tom for the management, and thanks to cedric for the whatever b0rkage. Thanks. Daniel Juyung Seo (SeoZ) On Sun, Aug 17, 2014 at 8:28 PM, Tom Hacohen wrote: > I think this one was a good release. Let's conti

Re: [E-devel] 1.12 release schedule proposal

2014-08-17 Thread Tom Hacohen
I think this one was a good release. Let's continue doing it this way. -- Tom. On Thu, Aug 14, 2014 at 9:21 AM, Stefan Schmidt wrote: > Hello. > > Later than usual but I wanted some time to think about how tis cycle > went and if I want to keep doing this job. > > Timing wise I would leave the

[E-devel] 1.12 release schedule proposal

2014-08-14 Thread Stefan Schmidt
Hello. Later than usual but I wanted some time to think about how tis cycle went and if I want to keep doing this job. Timing wise I would leave the schedule like we had it for 1.11 which basically means 1.12 would be release November the 10th 2014. 2014-08-18 EFL release 1.11 / Merge window for