I'm also ok with starting over on testing at this point.
I spent a while late last week and this weekend trying to wrap up
fcrepo-1047, but was unsuccessful.
https://jira.duraspace.org/browse/FCREPO-1047
My initial goal was just to validate what Frank had done and merge to
master. But, as sugges
-BEGIN PGP SIGNED MESSAGE-
Hash: SHA1
I'm not responsible but for a pair of full install/integration test setups, but
I'd be happy to "do over".
- ---
A. Soroka
Software & Systems Engineering :: Online Library Environment
the University of Virginia Library
On Jun 12, 2012, at 1:56 PM, B
What the status of testing so far? If it's a judgment call, we should
probably defer to the release manager.
On Tue, Jun 12, 2012 at 10:48 AM, Edwin Shin wrote:
> It's a day after code-freeze, but I finally have fcrepo-954 merged locally
> and passing all tests. There were actually some bugs in
It's a day after code-freeze, but I finally have fcrepo-954 merged locally and
passing all tests. There were actually some bugs in the fcrepo-954 branch which
took me awhile to run down--I ended up cherry-picking each individual commit to
narrow the problem space.
Do we want to make an exceptio