On Mon, Jun 29, 2015 at 1:08 PM, Stefan Beller wrote:
> (optional nit, bikeshedding)
> In conjunction with the previous patch I just wonder when we put a
> TODO and when we want to put a NEEDSWORK, or if we're being
> inconsistent here as both issues will be resolved in a later patch
> in the seri
On Sun, Jun 28, 2015 at 7:05 AM, Paul Tan wrote:
> git-am applies a series of patches. If the process terminates
> abnormally, we want to be able to resume applying the series of patches.
> This requires the session state to be saved in a persistent location.
>
> Implement the mechanism of a "patc
2 matches
Mail list logo