[Goanet] RE: Dabolim versus Mopa replacement airport.

2005-09-11 Thread Philip Thomas
Why a tiny place like Goa needs a second airport? Are there any studies made that Goa needs two airports in the next 25 or 50 years? If Dabolim needs extra land for runways, it can be acquired. There is also an option of constructing an extension of runways into the sea.[Carlos] This argument

Re: [Goanet] RE: Dabolim versus Mopa replacement airport.

2005-09-11 Thread carlos6143
Philip Thomas [EMAIL PROTECTED] wrote: The actual sequence should be: 1. Navy should curtail its training flights at Dabolim so that civilian flights can expand. Response: Agree 2. Navy should expedite clearance and construction of Seabird airfield (6000 feet) and shift its flights to

[Goanet] RE: Dabolim versus Mopa replacement airport.

2005-09-08 Thread Philip Thomas
Dabolim airport was built around 1953, and is very basic. It is a runway and the terminal building does not have the capacity for enlargement. Not a word in this piece about why the Navy is sitting tight at Dabolim and not making any headway whatsover with the airfield at Seabird after all these