In reflecting on the incompetence of Goa State Infrastructure Development
Corporation (GSIDC) and its botch up execution of the new High Court
building, memories go back to 2014. I had then petitioned the High Court
against GSIDC over its substandard and chaotic concretization of the
Miramar-Dona Paula Road.

While the GSIDC assured that we would get a State of the Art road, with
cycling and jogging tracks etc etc, the High Court felt that we should
trust the expertise of the GSIDC. The rest is history.



Now the rank deficiency in proficiency of GSIDC is at the very doorstep of
the High Court for all to see. Coincidentally the same politically well
connected contractor who messed up the Miramar-Dona Paula Road was also
involved in our High Court cock-up. .



GSIDC having failed in project after project must now be thoroughly
audited. This High Court fiasco must ensure that responsibility is fixed.
The buck stops at the door of its Chairman Pramod Sawant, a post he has
continued to hold even after becoming Chief Minister.



Those responsible deserve to be sacked and face the rigors of law. We need
to know who at GSIDC  made hay while the sun shined. Public funds must be
judiciously spent and cannot be pocketed.



What has transpired in the construction of our High Court building has
undoubtedly been a grand ‘daylight highway loot’.




Adv. Aires Rodrigues

C/G-2, Shopping Complex

Ribandar Retreat

Ribandar – Goa – 403006

Mobile No: 9822684372

Office Tel  No: (0832) 2444012

Email: airesrodrigu...@gmail.com



You can also reach me on

Facebook.com/ AiresRodrigues

Twitter@rodrigues_aires

www.airesrodrigues.in

Reply via email to