Thanks for the insight. It is appreciated.
Craddock, Chris wrote:
That's a non-sequitur. The exit routine (typically) is NOT linked AC(1)
because that is only relevant for job step programs. The exit routine
must be loaded from an APF-authorized library, but that is primarily to
ensure install
This is with reference to RMF Report analysis regarding MVS Busy and LPAR
Busy parameter ...
Attached is the RMF Report.
Almost everyday we are facing CPU Contetion issues.
>From the report we can infer tht for most of the intervals there were 100%
CPU Contention however is it possible to get ex
On Sun, 1 Jan 2006 10:30:35 +1000, ibm-main <[EMAIL PROTECTED]> wrote:
>Seems you are trying to use for the wrong reason.
>Why don't weightings fulfil your requirements - especially if you are
>prepared to use the whole box ???.
>Soft capping is a *financial* contortion, not a technical aid to so
Is it possible to freeze the operations of any LPAR ?
I have 4 LPARs configured in my OS/390 system with production uncapped and
other capped sometimes when there is heavy CPU requirement for Prod LPAR I
have to bring down other 3 lpars so tht all MIPS will be used by Production
alone but bringi
4 matches
Mail list logo