My bad, the daily SMF dump job did NOT run at 2:00 AM on May 11th as it was
scheduled to run. That job was supposed to dump data for the 10th. There was
testing going on for the replacement joblog/sysout archiver software that
caused all scheduled jobs on the sandbox LPAR for May 11th to wait
What records are not missing from Sandbaox on May 10th? Do you have
the job logs from SMF off-loading for may 10th data? What do the 2
and 3 SMF record time-stamps from the May 10th -look like?
Michael
At 09:06 AM 6/3/2024, rpinion865 wrote:
Content-Transfer-Encoding: base64We are running
In the system log check the SMF swap times and the batch jobs that
copy and re-initialize the SMF files.
On Mon, Jun 3, 2024 at 9:07 AM rpinion865
<042a019916dd-dmarc-requ...@listserv.ua.edu> wrote:
>
> We are running z/OS 2.4 on a z15 with three LPARs (Production, Development,
> and
We are running z/OS 2.4 on a z15 with three LPARs (Production, Development, and
Sandbox). We use SMF log streams to collect our SMF records. We kick off a
batch job everyday at 2:00 to capture the previous day's SMF records from the
log stream, and write them to a GDG dataset. SMF Type 89 is