On Jun 3, 10:18 pm, Ryan Waldon ryanwaldon2...@gmail.com wrote:
Regardless of conflicts, I don't think it's a good idea to place two
of your backup strategies on the same drive. It essentially means you
really only functionally have one backup.
Agree. This is temporary until I get a
On Jun 3, 3:14 pm, Fabian Fang f...@mac.com wrote:
On Jun 3, 2009, at 10:59 AM, Al Poulin wrote:
If I schedule CCC for backups by the clock and CCC wants to run upon
wake at the same time as Time Machine, there would be two backup
operations going at the same time to two separate volumes
On Jun 3, 2009, at 20:28, Al Poulin alfred.pou...@gmail.com wrote:
On Jun 3, 3:14 pm, Fabian Fang f...@mac.com wrote:
On Jun 3, 2009, at 10:59 AM, Al Poulin wrote:
If I schedule CCC for backups by the clock and CCC wants to run upon
wake at the same time as Time Machine, there would be two