Title: Question about process scheduleing
I'm trying to look into a problem with the amount of time it takes us to do a checkout of a large (800 meg) module.
On most of the machine in the shop it takes between 10 and 15 minutes, on one machine it can take an hour.
When I look at top
Lynch, Harold wrote:
I'm trying to look into a problem with the amount of time it takes us to
do a checkout of a large (800 meg) module.
On most of the machine in the shop it takes between 10 and 15 minutes,
on one machine it can take an hour.
When I look at top on the cvs server, the process
Lynch, Harold wrote:
I'm trying to look into a problem with the amount of time it takes us to do
a checkout of a large (800 meg) module.
On most of the machine in the shop it takes between 10 and 15 minutes, on
one machine it can take an hour.
When I look at top on the cvs server, the
Lynch, Harold writes:
On most of the machine in the shop it takes between 10 and 15 minutes,
on one machine it can take an hour.
Look for network problems with that machine -- that sounds like dropped
packets and retransmissions.
-Larry Jones
Yep, we'd probably be dead by now if it wasn't