temporarily locking cvs checkins

2001-11-21 Thread Ant User
Hi: We are doing continuous build using cruisecontrol and now want to stop checkins into cvs while the job is running. It normally takes about 20 mins. We want to block any commits during this time. Is there any way to do it in the client ? Thanks in advance, joe __

Re: temporarily locking cvs checkins

2001-11-21 Thread Larry Jones
Ant User writes: > > We are doing continuous build using cruisecontrol and > now want to stop checkins into cvs while the job is > running. It normally takes about 20 mins. We want to > block any commits during this time. Is there any way > to do it in the client ? No, there are no ad-hoc lockin

Re: temporarily locking cvs checkins

2001-11-21 Thread Kaz Kylheku
In article <[EMAIL PROTECTED]>, Ant User wrote: >Hi: > >We are doing continuous build using cruisecontrol and >now want to stop checkins into cvs while the job is >running. It normally takes about 20 mins. We want to >block any commits during this time. Is there any way >to do it in the client ?