[ https://issues.apache.org/jira/browse/MATH-405?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Dimitri Pourbaix resolved MATH-405. ----------------------------------- Resolution: Fixed > Inconsistent result from Levenberg-Marquardt > -------------------------------------------- > > Key: MATH-405 > URL: https://issues.apache.org/jira/browse/MATH-405 > Project: Commons Math > Issue Type: Bug > Affects Versions: 2.1 > Reporter: Dimitri Pourbaix > Assignee: Dimitri Pourbaix > Fix For: Nightly Builds > > Attachments: MATH-405.patch > > > Levenberg-Marquardt (its method doOptimize) returns a > VectorialPointValuePair. However, the class holds the optimum point, the > vector of the objective function, the cost and residuals. The value returns > by doOptimize does not always corresponds to the point which leads to the > residuals and cost -- This message is automatically generated by JIRA. - You can reply to this email to add a comment to the issue online.