[ 
https://issues.apache.org/jira/browse/DRILL-4997?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Sudheesh Katkam closed DRILL-4997.
----------------------------------
    Resolution: Duplicate

> Perform parquet filter pushdown in logical planning. 
> -----------------------------------------------------
>
>                 Key: DRILL-4997
>                 URL: https://issues.apache.org/jira/browse/DRILL-4997
>             Project: Apache Drill
>          Issue Type: Bug
>          Components: Query Planning & Optimization
>            Reporter: Jinfeng Ni
>
> DRILL-1950 put parquet filter pushdown rule in physical planning phase, after 
> all join order related tasks have been done.  Main reason for doing this is 
> we want to reduce the performance regression possibility caused by a 
> different join order, as a result of reduced row count in scan operator. 
> Ideally this should be done in logical planning, before join order planning 
> is done. Before we can make such change, we have to figure out how to adjust 
> the selectivity estimation of filter operator, after filter is pushed down to 
> scan.
>  



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to