[ 
http://jira.codehaus.org/browse/SUREFIRE-520?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Kristian Rosenvold closed SUREFIRE-520.
---------------------------------------

    Resolution: Won't Fix

http://mail-archives.apache.org/mod_mbox/maven-dev/201101.mbox/%3C1295866251.13332.27.camel@chunky%3E

> Multiple test passes with difference in fail on error
> -----------------------------------------------------
>
>                 Key: SUREFIRE-520
>                 URL: http://jira.codehaus.org/browse/SUREFIRE-520
>             Project: Maven Surefire
>          Issue Type: Wish
>          Components: JUnit 3.x support
>    Affects Versions: 2.4.3
>         Environment: Win2k3
>            Reporter: Kevin Wilson
>
> Not sure if this is possible with the current version or not, But looking for 
> a way to manage the execution o fthe tests. 
> The following is the scenario. I am developing a project with agile methods 
> and tdd.
> We would like to be able to define the tests that need to run early in our 
> sprint. And get them checked in even before they are passing. However, we do 
> not want these new tests to cause the build to fail.  At the same time, there 
> may be historical tests that need to continue to run, and if fail cause the 
> build to fail. At the end of our sprint, we would like to move the tests 
> created into the Regressions suite so that these then cause build failrues. I 
> can do one or the other now in the current environment. 
> How can I instrument this situation, is it possible with the current versions 
> of the tools. 
> Any help that can be given, on direction in the current version would be 
> helpful. 
> For example: if we have the following Junit test configuration.
> Current.java - Current Test Suite (fail on error false)
>    - Sprint3.java - Sprint 3 test suite
>       TestFeature 3 - test case for feature 3
> Regression.java - Regression Test Suite (fail on error true)
>    - Sprint2.java - Sprint 2 test suite
>         TestFeature2 - TestCase for feature 2
>   - Sprint1.java - Sprint 1 test sutie
>         TestFeature1 - TestCase for feature 1;
> At the end of the sprint we would like to create a new Sprint4 and then move 
> the sprint3 suite to the Regression suite.
> Thanks,
> Kevin

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: 
http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

Reply via email to