Hi Geeks Found a problem with two notification registered at the Timer MBean. It seems that even the period is set correctly (from Timer MBean) the periods are not calculated correctly.
Please have a look at the new test "testTwoNotificationProducers in the timer.BasicTestCase which register two notifications (how ever created this names should be punished for that) with different periods. The test then checks if the order of the notifications and the time between the notifications are correct. This problem is causing my Scheduler to fail with two Schedulers. Have fun xxxxxxxxxxxxxxxxx Andreas Schaefer Senior Consultant JBoss Group, LLC xxxxxxxxxxxxxxxxx _______________________________________________________________ Don't miss the 2002 Sprint PCS Application Developer's Conference August 25-28 in Las Vegas -- http://devcon.sprintpcs.com/adp/index.cfm _______________________________________________ Jboss-development mailing list [EMAIL PROTECTED] https://lists.sourceforge.net/lists/listinfo/jboss-development