Hi Geeks

Found a problem with two notification registered at
the Timer MBean. It seems that even the period is
set correctly (from Timer MBean) the periods are
not calculated correctly.

Please have a look at the new test "testTwoNotificationProducers
in the timer.BasicTestCase which register two notifications (how
ever created this names should be punished for that) with different
periods. The test then checks if the order of the notifications and
the time between the notifications are correct.

This problem is causing my Scheduler to fail with two
Schedulers.

Have fun

xxxxxxxxxxxxxxxxx
Andreas Schaefer
Senior Consultant
JBoss Group, LLC
xxxxxxxxxxxxxxxxx



_______________________________________________________________

Don't miss the 2002 Sprint PCS Application Developer's Conference
August 25-28 in Las Vegas -- http://devcon.sprintpcs.com/adp/index.cfm

_______________________________________________
Jboss-development mailing list
[EMAIL PROTECTED]
https://lists.sourceforge.net/lists/listinfo/jboss-development

Reply via email to