Muchas Gracias! / Thank you very much!
I made a merge between these tutorial and the hello example and I could deploy
my little process.
A made an asnyncronous process with the bonjour example, and the changes I did
in the sources to deploy was:
Delete the TYPE DEFINITION in the wsdl
Change
First, I am using JBoss 4.0.5.GA, jbpm-bpel-1.1Beta3 and Eclipse BPEL Designer
0.3.
Secondly, I made a simple bpel process to test the correlation sets. Later I
had to change the
xmlns:bpws=http://docs.oasis-open.org/wsbpel/2.0/process/executable; to
Yes, it´s right. It´s just a project to test some concepts.
And the initiate operation and onResult operation was create by default by the
Eclipse when I selected create a new Asynchronous BPEL Process.
Now I added an assign activity to the process to give it more sense.
Saludos Agus,
Hi
I am trying to develop and deploy a bpel process in Eclipse BPEL Designer 0.3
and jbpm-bpel 1.1Beta3 and Im having a lot of troubles deploying it
I read in http://lists.jboss.org/pipermail/jboss-user/2007-May/056699.html that
with the 0.2 version of Eclipse BPEL Designer it is easy to