Hy, I'm wondering what the best way is to make a RMI/Synchron-Call (from JBoss to JBoss) failsafe. So I have JBoss1 in wich is running a SSB (doing some things on DB return result), and JBoss 2 in wich is running a SSB calling SSB on JBoss1.
Problems that may occur: - SSB from JBoss2 tries to call SSB on JBoss1 and JBoss1 is down + how to retry the call? - SSB from JBoss2 calls SSB on JBoss1 and the connection gets lots during the call + how to retry the call? - SSB from JBoss2 calls SSB on JBoss1, SSB on JBoss1 changes things in the DB after that the connection between the two JBoss gets lost + how to rollaback the changes in the database? I took a look at jboss-remoting and it seems that this could solve this problems. Greets goldi View the original post : http://www.jboss.org/index.html?module=bb&op=viewtopic&p=4238714#4238714 Reply to the post : http://www.jboss.org/index.html?module=bb&op=posting&mode=reply&p=4238714 _______________________________________________ jboss-user mailing list jboss-user@lists.jboss.org https://lists.jboss.org/mailman/listinfo/jboss-user