Re: Allowing a job to run (triggered manually) only if a specific list of jobs are blue successful

2014-10-24 Thread Christopher Orr
On 09/10/14 15:38, Alon Nisser wrote: Is there a way to achieve that? getting the status of other jobs and checking if last run was success? I don't want to automatically run this deployment job on the upstream success, but to trigger this manually. but still safeguard by checking upstream

Allowing a job to run (triggered manually) only if a specific list of jobs are blue successful

2014-10-09 Thread Alon Nisser
Is there a way to achieve that? getting the status of other jobs and checking if last run was success? I don't want to automatically run this deployment job on the upstream success, but to trigger this manually. but still safeguard by checking upstream (multiple) success Thanks for the help