Rampup strategy / logic

2010-03-02 Thread Brett Cave
Hi, A thought on the logic used for thread groups: As a JMeter user, would I want to configure a total number of users to simulate over a time period, with delays in order to achieve this, or would it be more practical from a testing point of view to set a target Concurrent threads with a

Re: Rampup strategy / logic

2010-03-02 Thread sebb
On 02/03/2010, Brett Cave brettc...@gmail.com wrote: Hi, A thought on the logic used for thread groups: As a JMeter user, would I want to configure a total number of users to simulate over a time period, with delays in order to achieve this, or would it be more practical from a testing