It's not possible to add more threads after starting a test.
One way round this is to use a long ramp-up period, but this needs to
be decided before starting the test.
Another is to use a throughput controller which depends on a property,
and change the value of the property at run-time using the
Hi,
Is it possible to change the number of threads (to add more thread/ remove
part of the threads / stop one group) after starting the test?
Thanks!
-
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-ma
2 matches
Mail list logo