* Giovanni Bellac
> Each of our customer (layer2) rack-switches are connected with a
> trunk (lacp) to the VC. So we can shutdown one EX4200 of the VC (2x
> EX4200) without downtime on paper ?
>
>
> I have read in the forums of Juniper, that you CAN NOT upgrade a VC
> without downtime, because
> -Original Message-
> From: juniper-nsp-boun...@puck.nether.net [mailto:juniper-nsp-
> boun...@puck.nether.net] On Behalf Of Giovanni Bellac
> Sent: Sunday, March 20, 2011 4:33 PM
> To: juniper-nsp@puck.nether.net
> Subject: [j-nsp] VC (2x EX4200) JunOS Upgrad
Hello
I am going on to do a JunOS upgrade from 10.0S10 to latest 10.4 due sflow
issues
in 10.0.
Here are the docs from Juniper:
http://www.juniper.net/techpubs/en_US/junos10.0/topics/task/installation/ex-series-software-installing-single-routing-engine-cli.html
It looks easy.
Each of our cus
3 matches
Mail list logo