Hi all
I've been configuring a Circulation Rule with Zero (0) days for loans in Koha
3.2, 3.4 and 3.6 without any problems ('Checked out on' date and 'Due date' are
the same) but for Koha 3.8.x this seems impossible: 'Due date' displays a date
21 days after the 'Cheked out on' date.
Where can
I've been configuring a Circulation Rule with Zero (0) days for loans in Koha
3.2, 3.4 and 3.6
without any problems ('Checked out on' date and 'Due date' are the same) but
for Koha 3.8.x
this seems impossible: 'Due date' displays a date 21 days after the 'Cheked
out on' date.
I'm
2 matches
Mail list logo