On 17/03/2012 11:12, Michele Lewis wrote:
> You can’t do that. Two separate dates need to be two separate events.
> If you have two events in one date field it will format it as a range.
>
> 04 Feb 1844 – 10 Jun 1845 (meaning through)
>
> Or you can do this…
>
> Bet. 04 Feb 1844 and 10 Ju
You can’t do that. Two separate dates need to be two separate events. If you
have two events in one date field it will format it as a range.
04 Feb 1844 – 10 Jun 1845 (meaning through)
Or you can do this…
Bet. 04 Feb 1844 and 10 Jun 1845 (meaning between)
But you can’t do
04 F
As well as what Tony has suggested the way I do it is to use the first date for
the event, then in the notes I just add something like . There was also a
report on 2nd date, or . A follow up report on date 2 read:.. or if the
text is not too long to transcribe I would attach a pdf or
3 matches
Mail list logo