Hi Caesar,
On 06/09/2015 05:49 PM, Caesar Wang wrote:
We need different orderings when turning a core on and turning a core
off. In one case we need to assert reset before turning power off.
In ther other case we need to turn power on and the deassert reset.
In general, the correct flow is:
C
Caesar,
On Tue, Jun 9, 2015 at 2:49 AM, Caesar Wang wrote:
> We need different orderings when turning a core on and turning a core
> off. In one case we need to assert reset before turning power off.
> In ther other case we need to turn power on and the deassert reset.
>
> In general, the correc
We need different orderings when turning a core on and turning a core
off. In one case we need to assert reset before turning power off.
In ther other case we need to turn power on and the deassert reset.
In general, the correct flow is:
CPU off:
reset_control_assert
regmap_update_bits(p
3 matches
Mail list logo