[RFC PATCH 2/3] sched/deadline: Hierarchical scheduling with DL on top of RT

2017-03-31 Thread Alessio Balsini
The runtime of RT tasks controlled by CGroups are enforced by the SCHED_DEADLINE scheduling class, based on the runtime and period (the deadline is set equal to the period) parameters. sched_dl_entity may also represent a group of RT tasks, providing a rt_rq. Signed-off-by: Andrea Parri Signed-o

Re: [RFC PATCH 2/3] sched/deadline: Hierarchical scheduling with DL on top of RT

2017-03-31 Thread Peter Zijlstra
On Fri, Mar 31, 2017 at 07:44:36PM +0200, Alessio Balsini wrote: > The runtime of RT tasks controlled by CGroups are enforced by the > SCHED_DEADLINE scheduling class, based on the runtime and period (the > deadline is set equal to the period) parameters. > > sched_dl_entity may also represent a g