Dear Matpower Folks:
I have larger network that is a solved load flow case from an ISO.
The AC power flow converges fine, but neither AC nor DC OPF solve.
I supplied my own estimated generator costs, and perturbed them so that
none are identical.
I get the following error:
>> mpc =
Dear All
I am facing convergence problem during the calculation of DCOPF in
IEEE buses. For my work I have fixed the capacity of transmission line 110% of
initial power flow by changing the RATE_A field, then at each time, I increase
the load and generation with a factor (1+alpha).