Question on MATPOWER program....please reply to this email address.

2018-04-21 Thread Khawla Munawwer
Can someone help me with dispatching the load or how to add a solar to power generation to limit the voltage violations.Following are the objectives: I want to Run 24-­‐‑hour simulations and report the voltage, losses and line loading. If the voltage violates the standard limits of 0.95 PU – 1.05

Re: Load scale, DC OPF for 24Hr

2018-04-21 Thread Mohammed Alhajri
thank you, i did it and it works clear all; clc; define_constants; factor = [0.827315297246503; 0.870524914020136; 0.89225313150181; 0.874238893371013; 0.841447907563717; 0.84108393381471; 0.79110106954204; 0.797588753768103; 0.801421029392904; 0.82201