Hi, Dr. Zimmerman:
In my case, the optimal power flow result is numerically failed. I tried to
use check_feasibility(mpc) to find out the reason. The following is the
result.
V = check_feasibility(mpc)
V = 0.6097
Does this mean my generation is not enough? But after I increased the
description about building
matrix A. Assume there is a 16 buses system with 6 generations and I want
to add one constraint to ensure that power generation equals to the loads.
2) By far, dispatchable loads is the only way to simulate renewable energy?
Thank you very much.
Best,
Jun Hao